中文字幕一区二区在线播放_中文字幕一区二区精品区_中文字幕在线看无码a_中文字幕在线观看91_中文字幕永久免费_无码视频一夜夜嗨_无码任你躁久久久久久老妇91

Language:CHINESESENGLISH

Home > News > Guangzhou Steel tells you: fireproof coatings inspection process after construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.jbpfund.com

Guangzhou Steel tells you: fireproof coatings inspection process after construction

Time:[2015-8-12]  Hits:4963

Guangzhou Steel tells you: fireproof coatings inspection process after construction

Fireproof coatings as a construction material in the construction is completed this process must be tested, then test for fireproof coatings how have requested it, following Guangzhou Steel come to find out.

1, fireproof coatings test should provide the following reports:

(1) fire-resistant fire retardant coating countries view the institution of the limits to view reports and view reports of physical and chemical properties, fire supervision department issued a production license and production of the factory's product certification;

(2) the construction site to view the document and quality management during the construction process submissions major questions;

(3) See shaded engineering inspection items inspection records;

(4) completion report after the completion of the single and self-test report;

(5) the amount of purchase orders fire retardant coating;

(6) Fire paint coating edge construction side view records.

Fireproof coatings should be included in the "construction of fire facilities View order", "construction project fire inspection norms" and other technical specification, all painted interior and exterior coating of steel structure fire test before the completion of construction, the agency must have a view of the steel body structure fire retardant coating to view compliance report. Fireproof coatings viewing and inspection is mainly based on: GB14907-2002 "steel structure fire general technical conditions", GB50205-2002 "steel works and construction quality inspection norms", CECS24 "fireproof coatings technical specifications." Guangzhou Steel steel structure fire fire resistance of measuring methods, should be based on the type of environment and concluded by the fire, such as: petrochemical enterprises to use fireproof coatings, its fire resistance test should be based on temperature curve hydrocarbon fire determined before more realistic.

After brushing fire retardant coating on steel, greatly improving the fire resistance of steel, but in fireproof coatings applications, there are coatings improper selection, poor construction management, completed inspection, viewing and many other non-standard questions , seriously affecting the quality fireproof coatings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
棋牌| 和田市| 沙田区| 略阳县| 平安县| 西畴县| 鄂尔多斯市| 吉安县| 禄丰县| 浦县| 财经| 临潭县| 云霄县| 克什克腾旗| 舒兰市| 铁岭县| 忻州市| 都兰县| 合江县| 正镶白旗| 山东| 澄城县| 淮南市| 柏乡县| 敦煌市| 奈曼旗| 巧家县| 芷江| 宁阳县| 灵石县| 阿坝县| 五常市| 盐源县| 南投市| 江阴市| 永顺县| 武隆县| 楚雄市| 江城| 阿荣旗| 始兴县|